Sunday, November 2, 2014
End of stage Frame:
Things have moved along speedily on the build. We found a completed frame resplendent with tiled roof by the weekend. Behold:
Saturday, October 25, 2014
Monday, October 20, 2014
Ground floor frame
Got a phone call today - Monday, saying that the frame had been delivered... and the ground floor erected. They certainly do not seem to be messing around!
Monday, October 13, 2014
Slab preparations
Today the site was prepared for pouring the slab, which is scheduled for tomorrow (Tuesday). It was really exciting to see the house dimensions in situ finally and actually made us more relaxed about the surrounding space. We know what it should look like, having seen a similar layout. Until you actually have something on your own plot though... It doesn't seem quite real.
Despite the hole in the fence, we were good customers and did not venture onto site making do with photos from the ever popular hand above head position and hoping that the angle was good.
Behold the finished piece as of today (Tuesday):
Despite the hole in the fence, we were good customers and did not venture onto site making do with photos from the ever popular hand above head position and hoping that the angle was good.
Behold the finished piece as of today (Tuesday):
Sunday, October 5, 2014
In the words of Murray Walker: " GO GO GO!"
Behold - the fence is up, we have a loo, and men and machines have combined efforts to start scraping away at our land as work on the slab stage has begun!
Upcoming dates:
9th October - drains going in
Slab poured by (worst case) 15th October.
Upcoming dates:
9th October - drains going in
Slab poured by (worst case) 15th October.
Monday, March 24, 2014
Land Ho!
Land
Land titling is happening right now and we popped down to have a look and see if the small changes they had to make to the driveway crossovers were finalised. The fences were down.
Friday, December 27, 2013
General update,tiles and finalising
It has been a long time since posts. Since last post, we have completed all of our contract signings and are now just awaiting land titling. First up we had the final contract signing with Metricon. At which, we still did not have a finalised and fully accurate set of plans put in front of us. These changes have been made but it was a tad alarming that given so much time this was not sorted out before contract date.
The next week saw us finalise our tiling choices and a bleed over from our contract issues was that the tiling people did not have the correct surface areas, or correct plans to work with. Our updated laundry, for instance, was completely wrong and we had to fight a little to get the new extended bench top put in, with full overhead cupboards. This was, as you can imagine, annoying, though we were very well tempered about it. After all, we have had much practice already with things not being as they should be.
We contemplated a glass splashback in the colour shown above. Then we were won over by the eggshell tiles also shown here. We opted for an expanded tiling area up either side of the rangehood too. As a result it is a good job we liked the tiles better, as the splashback option was going to be thousands! Instead, with the kitchen tiles, some standard inclusion tiles for the laundry and some nice big bathroom tiles previously shown in the blog we came in well under anticipated cost for the tiling section of the house. This was a pleasant surprise and change from usual.
Since then not much has happened. We have been told the land should title in April, though after looking at the groundworks as we have passed a few times that seems a long way off. The only other thing was a spectacular save by Kylie. Whilst looking at someone else's Breeze-Blog, she noted that their pantry door seemed tiny, and it also had a cavity sliding door. So we looked into things and it turns out that whilst the fridge would have made it into the pantry and its designated space without the door, the door offered to us would have prevented this from being so. A couple of phone calls later, in which the idea of selling a pantry with fridge space but too small a door was ridiculed in good nature, we have had a post contract variation made to allow us to increase the door size so that our standard size (small!) fridge can reach its future home.
Subscribe to: